Safety Culture

Safety Culture: 6 Blind Spots That Make Operational Change Unsafe

Operational change can weaken safety without producing an obvious policy violation. These six blind spots help EHS managers and operations leaders test whether a change preserves critical controls, decision rights, and field evidence after the project plan is approved.

By 6 min read updated
corporate environment depicting safety culture 6 blind spots that make operational change unsafe — Safety Culture: 6 Blind Sp

Key takeaways

  1. 01A change process can be complete on paper while the people who operate the new condition still lack control evidence.
  2. 02The most dangerous cultural blind spots appear when ownership, workarounds, handovers, or escalation rights become unclear.
  3. 03Operational change should be reviewed through the critical controls that must remain reliable, not only through the project milestones that must be completed.
  4. 04Andreza Araujo’s experience in more than 250 cultural transformation projects connects repeated leadership decisions with the culture people actually experience.
  5. 05A strong change review ends with named decisions, field verification, and a clear response when the new condition does not work as designed.

A new production line, contractor, software system, or maintenance arrangement can weaken safety before anyone reports an incident. The paperwork may be complete, the training may be scheduled, and the project may still leave the operating team with an exposure that nobody clearly owns.

This article takes a critical position. Operational change is not safe because the approval workflow is complete. It is safer when leaders can show that critical controls, decision rights, and field verification survived the change in the conditions where people actually work.

Why operational change exposes safety culture

ISO 45001, updated in 2018, requires organizations to consider change within their occupational health and safety management system. That requirement matters because risk is rarely changed by a single technical modification. A new machine changes maintenance access, staffing, isolation points, training needs, production rhythm, and the authority required when the arrangement fails.

The cultural question is whether leaders treat those effects as part of the work or as administrative detail. James Reason’s work on latent failures helps explain why a frontline deviation can be prepared long before the operator touches the task. A design choice, an unclear handover, or an unrealistic schedule can remove a layer of protection while the formal process still appears healthy.

Across more than 250 cultural transformation projects, Andreza Araujo has consistently connected culture with repeated decisions. People learn what leaders truly protect by watching which concerns receive resources, which shortcuts are challenged, and which deadlines are allowed to overrule a control.

1. The approval blind spot hides who owns the changed exposure

A change request usually names a sponsor, a technical reviewer, and an approver. Those roles do not always identify the person who owns the exposure after the project enters normal operations. When ownership stops at approval, the condition can move between engineering, maintenance, production, and EHS without a decision-maker who sees the whole risk.

The gap becomes visible when the new arrangement needs an exception. A supervisor may know that the control is difficult to use, maintenance may know that access is restricted, and EHS may know that the risk assessment is outdated. Each group holds a fragment, while nobody has the authority to decide whether the work should continue.

Assign one operational owner for each high-consequence exposure created or changed by the project. The owner should be able to explain the control, approve resources, stop the activity, and accept only a residual risk that has been explicitly reviewed.

2. The procedure blind spot confuses publication with usability

A revised procedure can be technically correct and operationally unusable. It may assume access, staffing, tools, language, or time that the worksite does not have. The document is then treated as evidence of control even though the operating team has already built a workaround.

That workaround is not automatically a sign of careless behavior. It can be evidence that the new design does not fit the real sequence of work. A safety culture that punishes the person who reveals this mismatch will preserve the document and lose the warning.

Test the procedure where the task occurs, with the shift, equipment, interfaces, and interruptions that define the real job. Ask the worker to demonstrate the control rather than confirm that the text was read. Record where the sequence breaks, then redesign the condition before calling the change complete.

3. The handover blind spot turns a project boundary into a risk boundary

Many changes move through a formal handover from project to operations. The handover often transfers drawings, manuals, open actions, and training records, but it may not transfer uncertainty. The receiving team inherits a new condition without knowing which assumptions have not yet been tested.

This matters during night shifts, contractor transitions, and early production runs, when the people who approved the change may no longer be present. A control that depends on one engineer’s memory is not yet a dependable operating control.

Include unresolved assumptions in the handover itself. Name the control that is still being proven, the evidence required, the person who will review it, and the trigger that sends the issue back to the project owner. A handover should make uncertainty visible instead of giving it a new filing location.

4. The temporary-control blind spot makes short-term risk look acceptable

Temporary barriers are often introduced to keep production moving while a permanent solution is designed. They can be legitimate, but their presence changes the risk conversation because a temporary measure may be weaker, harder to verify, or dependent on extra attention.

The cultural failure occurs when the temporary arrangement has no expiry condition. Once the work becomes familiar, the organization stops treating it as a deviation and starts treating it as the normal design. The control is then defended by habit rather than by evidence.

Every temporary control needs an owner, a review date, a defined failure condition, and a decision about what happens when the date passes. If the permanent fix is delayed, the leader should record a new decision rather than allow the old exception to continue silently.

5. The performance blind spot rewards output while control quality deteriorates

Operational change creates pressure to prove that the investment is delivering. Leaders track commissioning dates, throughput, downtime, cost, and training completion. Those indicators matter, but they do not show whether the critical control remains reliable during the new operating pattern.

A site can meet the project schedule while supervisors spend more time correcting unsafe interfaces, operators bypass alarms, or maintenance teams work around inaccessible isolation points. If the dashboard counts only output, the culture receives a clear message about which result deserves protection.

Add one or two control-effectiveness questions to the change review. Can the control be verified at the point of work? Does the responsible person have the time and authority to maintain it? Are repeated deviations changing the design, or are they being closed as individual behavior issues?

6. The escalation blind spot makes speaking up expensive

People often raise concerns during change, but the response determines whether the next concern arrives early or after harm. A worker who reports a blocked access route, a missing isolation point, or an unrealistic sequence is testing the organization’s practical tolerance for bad news.

A response that asks the worker to “be careful” leaves the hazard in place and transfers the burden to the person with the least power to redesign the system. Amy Edmondson’s research on psychological safety is useful here because the issue is not comfort. It is whether people can contribute information that a team needs in order to make a better decision.

Close the loop with a visible decision. State what will change, who owns it, when the team will receive an update, and what work is paused until the condition is addressed. When the answer is no change, explain the reasoning and the additional protection required. Silence is not closure.

How should leaders test the new condition?

Review questionEvidence to requestWarning sign
Who owns the exposure?Named operational owner with authoritySeveral departments share responsibility
Can the control be used?Field demonstration on the real shiftOnly training attendance is available
What remains uncertain?Open assumptions and expiry conditionsHandover report says “complete”
What happens when work changes?Escalation trigger and decision routeSupervisor relies on informal judgment
Did the change improve control?Verification evidence after operation beginsProject metrics replace field evidence

The review should take place after the new condition has met real work, not only after the project team has completed its checklist. A short field review with operators, maintenance, supervision, and the risk owner can expose friction that a meeting room cannot see.

What does a stronger safety culture do differently?

A stronger culture does not promise that every change will be frictionless. It makes friction useful. Leaders expect the new arrangement to reveal questions, and they create a route through which those questions can alter the design, the schedule, or the control decision.

Andreza Araujo’s Safety Culture: From Theory to Practice is relevant because it treats culture as something people experience through decisions, not as a statement displayed beside the entrance. Her work at PepsiCo South America Foods, where the accident ratio fell 50% under a 180-day plan, also illustrates why visible ownership and time-bound execution matter more than activity volume.

For leaders, the practical test is simple to state even when it is demanding to perform. After the change, can the operating team explain what could cause serious harm, which control must hold, who can stop the work, and what evidence proves that the arrangement is working?

If those answers are unclear, the change is not finished. The organization has approved a plan, but it has not yet demonstrated a dependable operating condition.

Topics safety-culture operational-change critical-controls change-management safety-leadership risk-ownership

Frequently asked questions

Why can operational change weaken safety culture?
Operational change can weaken safety culture when leaders approve a new condition without clarifying control ownership, verification evidence, escalation rights, or the response to an unworkable procedure. The problem is often a decision gap rather than a missing policy.
What is the first safety-culture check after a change is approved?
The first check is whether the people doing the work can explain the changed exposure, the critical control, the evidence that confirms it is ready, and who has authority to pause or redesign the task.
How should leaders review temporary controls during change?
Leaders should define the temporary control, its owner, its expiry condition, and the evidence required at each review. A temporary control without an end point tends to become an informal permanent arrangement.
Does a completed management-of-change form prove that the change is safe?
No. A completed form shows that a process step occurred. It does not prove that the field condition is understood, that critical controls are available, or that the operating team can use the new arrangement under pressure.
Which Andreza Araujo book is relevant to safety culture during change?
Safety Culture: From Theory to Practice connects culture with the decisions leaders repeat and reinforce. It is useful when a change program needs to move from declared values to observable operating behavior.

About the author

Andreza Araújo

Safety Culture Expert | Senior EHS Executive

Andreza Araújo is a safety culture expert and senior EHS executive with more than 25 years of experience in environment, health and safety. She is a Civil Engineer and Occupational Safety Engineer from Unicamp, holds a Master's degree in Environmental Diplomacy from the University of Geneva, and completed sustainability studies at IMD Switzerland. Andreza has served in Global Head of EHS roles in Fortune 500 environments, leading cultural transformation programs across multinational operations. She has represented Brazil as a speaker at the United Nations in Paris and has spoken at the International Labour Organization in Turin. She is the author of more than 16 books on safety culture in Portuguese, Spanish, English and German. Her work has earned more than 10 EHS awards, including two recognitions from Indra Nooyi, former PepsiCo CEO.

  • Civil & Safety Engineer (Unicamp)
  • M.A. Environmental Diplomacy (University of Geneva)
  • Sustainability Cert (IMD Switzerland)
  • People Management & Coaching (Ohio University)
  • UN Paris speaker representative for Brazil
  • ILO Turin speaker
  • LinkedIn Top Voice
  • Indra Nooyi PepsiCo CEO recognition (2x)

Documentaries

Watch Andreza's documentaries

Three productions on safety culture, organizational failure and the human lessons behind major disasters.

Podcasts

Listen to Andreza's podcasts

She hosts three shows on safety leadership, EHS and organizational culture, in English and Portuguese.

Summarize with AI