risk-management
HAZOP vs FMEA vs Bow-Tie: Which Risk Method Fits Your Operation
HAZOP, FMEA and Bow-Tie solve different risk questions. The wrong choice creates analysis volume without improving critical-control decisions.
Workplace safety, safety culture, leadership and risk management, from an international perspective.
Por Andreza Araujo Global Safety Culture Specialist
Category
HAZOP, FMEA and Bow-Tie solve different risk questions. The wrong choice creates analysis volume without improving critical-control decisions.
Bow-Tie Analysis works only when leaders verify critical controls, owners, degradation factors, and SIF exposure in the field before failure.
A practical guide for supervisors who need PTRA forms to expose real field risk before high-risk work becomes another signed ritual on site.
Learn six risk matrix failures that make serious exposure look acceptable, and how EHS leaders can correct the review before harm occurs in the field.