
How to Review Workload Handoffs for Psychosocial Risk in 14 Days
A practical 14-day method for reviewing workload handoffs, decision authority, interruptions, and recovery conditions before psychosocial strain becomes a work-system problem.

4 Myths About Risk Acceptance That Operations Leaders Still Believe
Risk acceptance is not a permission slip for unresolved exposure. These four myths show why decision authority, evidence, and temporary controls must remain visible after a risk is accepted.

Temporary Deviations: 4 Traps That Turn Short-Term Fixes Into Permanent Exposure
Temporary deviations become dangerous when teams manage the exception but forget the reset. This F1 diagnostic shows supervisors, EHS managers, and risk owners how to distinguish a controlled short-term change from a permanent exposure disguised as a workaround.

Work Ability Explained: 4 Signals for Managers
Work ability is more than fitness for a task. These four signals help managers separate work-design strain from individual limitation and choose a safer response.
How to Calibrate Safety Observations Across Shifts in 21 Days
A practical 21-day method for making safety observations comparable across crews, supervisors, and shifts, so observation data changes decisions instead of becoming a volume target.

How a Global EHS Portfolio Changed the Meaning of Incident Closure
A portfolio case study from more than 250 safety transformation projects shows why incident closure must prove that operating decisions and field controls changed, rather than merely confirming that a report was signed.

5 Whys vs Fishbone vs Fault Tree: Which Investigation Method Fits the Evidence?
The best incident investigation method depends on the evidence, the system boundary, and the decision leaders need to make. Compare 5 Whys, Fishbone, and Fault Tree before choosing a method that could oversimplify a serious event.

Simultaneous Operations: 4 Distortions That Make Permit-to-Work Look Controlled
When maintenance, production, contractors, and temporary changes share one worksite, a signed permit can create false confidence. This diagnostic shows plant leaders how simultaneous operations distort ownership, isolation, timing, verification, and escalation.

New Workplace Mental Health Program Lead in 60 Days: What to Fix Before EAP Becomes the Whole Plan
A 60-day role profile for a new workplace mental health program lead who must connect EAP, work design, manager capability, escalation, and evidence before support becomes a disconnected benefit.

Role Conflict Explained: 4 Work-Design Signals
Learn how role conflict creates psychosocial risk, how to separate it from workload, and what EHS leaders can change when priorities collide.
Stories that help you read the signals.
Talks, consulting and masterclasses from someone who led EHS in Fortune 500 operations.