
Bow-Tie Analysis: 7 Critical Control Gaps
Bow-Tie Analysis works only when leaders verify critical controls, owners, degradation factors, and SIF exposure in the field before failure.

Pre-Task Risk Assessment: 7 Supervisor Checks
A practical guide for supervisors who need PTRA forms to expose real field risk before high-risk work becomes another signed ritual on site.

Working at Height Rescue Plan: 7 Controls
A practical guide for EHS managers who need working at height rescue plans to become permit-to-work controls, not emergency-folder paperwork.

Post-Incident Meetings: 7 Signals That Silence Teams
Post-incident meetings decide whether teams speak honestly after risk events or retreat into silence, hierarchy, and weak corrective actions.

Return to Work After Mental-Health Absence: 7 Rules
A safe return to work after mental-health absence needs role clarity, workload control, supervisor discipline and early warning indicators.

DART Rate: 6 Distortions Leaders Must Fix
DART rate helps compare injury impact, but leaders must pair it with SIF potential, speak-up data, and corrective-action quality.

Behavioral Observation: 7 BBS Failures to Fix
Behavioral observation fails when BBS counts cards instead of reducing exposure. See seven failures and how supervisors can fix them.

Speak-up Metrics: 6 Signals Leaders Should Track
Speak-up metrics reveal whether people can question risk before harm occurs, giving EHS and plant leaders a sharper view than TRIR alone in daily work.

LOTO Verification: 7 Checks Before Restart
LOTO verification only protects maintenance teams when every energy source, stored hazard, handover, and restart step is proven in the field.

Psychosocial Risk Assessment: 7 Errors That Hide Workload Harm
Psychosocial risk assessment fails when leaders treat pressure as personal fragility instead of operational exposure. Use these seven errors to redesign controls.
Stories that help you read the signals.
Talks, consulting and masterclasses from someone who led EHS in Fortune 500 operations.